The plumbing in a renovation is decided before the first tile is laid. Planning where every pipe, waste and drain goes before the walls are lined is what keeps a renovation on schedule and avoids opening finished work later.
GET A FREE QUOTE
Dorco Plumbing Contractors

Renovation plumbing in Kilmore covers the water supply, drainage and gas work inside a bathroom, kitchen or laundry upgrade, from the first site visit to the final connection. Dorco Plumbing Contractors works with homeowners, builders and renovators across Kilmore, Wallan, Broadford and the Mitchell Shire, and coordinates with the tiler, cabinet maker, electrician and carpenter so each trade can start on time.
Before demolition, the layout is checked against what the plumbing can do: whether the drain falls allow a toilet or shower to move, whether the existing pipes can feed the new fixtures, and where a floor waste needs to sit. Catching a problem at this stage costs a conversation; catching it after tiling costs the tiles.
Old fixtures are disconnected and the water, waste and gas points are capped safely so demolition can go ahead without leaks or a house without water for longer than necessary.


Dorco Plumbing Contractors

Bathrooms carry the most plumbing of any room in a renovation.
Relocating fixtures means moving waste pipes as well as water lines. A toilet needs a large-diameter waste with enough fall to the sewer, and a walk-in or open shower needs a floor waste or a linear drain set at the right height for the floor grade. On a concrete slab, moving a waste can mean cutting and re-laying part of the slab, so it is planned and priced up front.
Rough-in for rainfall shower heads, wall-mounted mixers, freestanding baths and spa baths is set to the exact fixture heights from the product specifications, because a mixer set a few centimetres out cannot be fixed once the wall is tiled.
The plumber's pipes and wastes pass through the waterproofed floor and walls, so they are installed before the waterproofing goes down and are sealed where they penetrate it. The waterproofing itself is a separate trade, and both are inspected before tiling begins.
Dorco Plumbing Contractors

Kitchen and laundry renovations bring new appliances and often a new layout.
Kitchen plumbing covers moving the sink, adding an island sink with its own waste and venting, dishwasher and fridge water connections, filtered water and boiling-water taps, and gas for a new cooktop or upright cooker. Gas cooktop connections are made by a licensed gasfitter; see the gas fitting page.
A laundry renovation can move the trough, add a second washing machine connection, or relocate a laundry into a cupboard or butler's pantry. Floor wastes, washing machine taps and the trough waste are installed to suit the new cabinetry, measured from the cabinet maker's drawings.


Dorco Plumbing Contractors

Renovation plumbing happens in two main stages, with other trades working in between.
Rough-in is the pipework laid inside the wall frames and under the floor before the walls are lined: water lines at the right heights, wastes in the right positions and the mixer bodies set into the wall. The rough-in is tested for leaks under pressure before the walls are closed.
Fit-off comes after tiling and cabinetry: taps, toilets, basins, showers, the bath and appliances are installed, connected and tested. A hot water upgrade is often done at the same time; see the hot water systems page.
In Victoria, a licensed plumber must issue a compliance certificate for plumbing work valued at $750 or more, and for below-ground sanitary drainage work regardless of value. Almost every bathroom renovation needs one. The certificate is lodged with the Building and Plumbing Commission and a copy goes to the homeowner.
Dorco Plumbing Contractors

On larger renovations and extensions, the plumber works to the builder's program. Turning up for rough-in on the day the frames are ready, and for fit-off the day the tiling is finished, is what stops a renovation stalling. Dorco Plumbing Contractors works directly for homeowners managing their own renovation and as the plumbing contractor for local builders. New home and extension plumbing is covered on the residential plumbing page, and drainage that needs excavation on the earthworks page.


Dorco Plumbing Contractors

A renovation is the cheapest time to fix the plumbing nobody can see. Once the walls are stripped back, the pipes behind them are exposed for the first time in decades, and replacing them costs a fraction of what it would after the new tiles are on.
Many older homes in the region still have galvanised steel water pipes that rust from the inside and lose pressure, copper with pinhole leaks, or grey polybutylene pipe from the 1980s and 1990s that can become brittle at the joints. Old earthenware drains under a bathroom can be cracked or root-damaged. During a renovation these are inspected, and where they are failing they are replaced with modern copper or approved polyethylene water pipe and PVC drainage. Adding isolation valves to each fixture at the same time means a single tap can be repaired in future without shutting off the whole house.
Dorco Plumbing Contractors

Renovation plumbing is quoted from the plans and a site visit. The main factors, from the smallest effect to the largest, are:


Dorco Plumbing Contractors

The questions Kilmore homeowners ask most often before a renovation.
As early as possible, ideally before the design is final, so the layout can be checked against the plumbing. The plumber is then booked into the program for strip-out, rough-in and fit-off.
Usually yes, provided the new waste can fall to the sewer. On a raised timber floor it is straightforward; on a slab it may need cutting and re-laying part of the slab.
Most do. Plumbing work valued at $750 or more, or any below-ground sanitary drainage work, needs a compliance certificate from a licensed plumber in Victoria.

Start by completing the 'Get a Free Quote' form on our website to share your Renovations needs with us.

Next, we'll arrange a property visit at a time that works for you to provide an in-person estimate for your Renovations needs.

After you approve our estimate, we'll schedule a date to complete the job. Our team will work hard to exceed your expectations!
GET A FREE QUOTE

BUSINESS
SERVICES
SERVICE AREAS
OPERATING HOURS
Monday: 24hrs
Tuesday: 24hrs
Wednesday: 24hrs
Thursday: 24hrs
Friday: 24hrs
Saturday: 24hrs
Sunday: 24hrs